NPCI is building two 700MW pressurised heavy water reactors (PHWR), including Units 3 and 4 at Kakrapar, where there are two 220MW power plants. Officials say that in July, the fourth unit recorded 97.56% progress.

Wonder why they’re building these instead of thermal coal plants

  • Whisp@kbin.social
    link
    fedilink
    arrow-up
    44
    arrow-down
    1
    ·
    1 year ago

    That’ll be huge for India. I imagine with that big of an increase in their power generation, that the quality of life for a huge swathe of Indians will improve.

      • GenEcon@lemm.ee
        link
        fedilink
        arrow-up
        11
        ·
        1 year ago

        It took India 16 years from planning to operation. So it will not only be cheaper, but a lot faster as well.

      • Zippy@lemmy.world
        link
        fedilink
        arrow-up
        7
        arrow-down
        1
        ·
        1 year ago

        From a guy that installed a 5kw system on my house in Mexico, Solar non base load systems are so inconsistent that they are a poor choice if you want to really help people. You need base load power generation otherwise you will have very unstable power grids.